Cutting edge technology under construction at AMRC to take carbon fibre weaving to new dimension

31 July 2018

Construction of a flagship fibre processing equipment that will take carbon fibre weaving to a new dimension is gathering pace at the University of Sheffield AMRC Composite Centre.

The impressive 3D weaving loom and Jacquard is the centerpiece of a collection of state-of-the-art equipment purchased by the Advanced Manufacturing Research Centre (AMRC) following a successful funding bid made to the Aerospace Technology Institute.

It is being constructed in the heart of the Composite Centre, taking about two weeks to build, and every stage of the complex assembly is being captured using a time-lapse video camera.

The 3D loom accompanies other new equipment at the centre – a braiding system, tailored fibre placement, a high temperature-high tension filament winder, stitching robot, tow-spreading machine and robotic end effectors for automated handling – which will be used to manufacture preforms and develop the enabling technology for commercialisation including joining, automation and impregnation.  

Dry Fibre Development Manager at the AMRC Composite Centre, Chris McHugh, said the 3D weaving loom and Jacquard opens up a new range of opportunities for producing very complex carbon fibre preforms.

“It will take carbon fibre weaving to a new dimension,” said Chris, who recently joined the AMRC Composite Centre with decades of textile experience under his belt having previously worked for James Dewhurst, NWTexnet and Sigmatex.

“This equipment will play a key part in the next generation of Lightweighting material for aerospace and automotive taking a multi-material, multi-process approach to preforming.

“A time-lapse camera will capture every stage of the build so that people can really see the work that goes into constructing big equipment like this and see how it takes shape.”

Related News

Factory 2050 scoops top industry design award
07/07/2016
Factory 2050 has been named Project of the Year at the Constructing Excellence Awar …
University of Sheffield makes advanced manufacturing links to China's space programme
26/09/2016
The Advanced Manufacturing Research Centre and the Shanghai Academy of Spaceflight Te …
Lord Mayor's AMRC visit paves the way to spread the manufacturing excellence message worldwide
01/08/2016
A visit by the Lord Mayor of London to the University of Sheffield Advanced Manufactu …
Generous AMRC staff help to 'Make it Better' for Sheffield children
08/07/2015
A team of colleagues from the AMRC with Boeing have raised an amazing £445 fo …